N_031.mp4

: Ensure the hoist limit switch stops the winch before the hook hits the boom tip.

: Set the boom between 0 and 5 degrees. Use an inclinometer to verify the actual physical angle. n_031.mp4

Detailed wiring diagrams and flowcharts can be found in the PAT DS350 Service Manual or via WIKA Mobile Control Support . LENGTH-ANGLE-RADIUS-LOAD INDICATING SYSTEM : Ensure the hoist limit switch stops the

: Reconnect hoses and bleed the air from the hydraulic lines to ensure accurate readings. ⚠️ Critical Safety Checks n_031.mp4

The angle sensor ensures the crane's boom is at the correct pitch for safe lifting.

: Test that the system successfully disables crane functions during an overload condition.

The length sensor measures boom extension via a potentiometer in the cable reel.